Drop a filing, it finds the template
Upload a PDF, docx or xlsx through the encrypted dropzone. The document type is detected and matched to a template, so there is nothing to set up.
Encrypted dropzone · up to 20 MBTemplates / Construction Subcontractors
Change Order
Parse change order numbers, cost adjustments, schedule extension days and approval signatures from change orders, each traced to the form field it came from.
Built for: Project Engineer. Free for your first 5 documents.
What this template extracts
A real extraction
Choose a template
A subcontract for the Northwest Arkansas Project. It’s a public document, filed on SEC EDGAR. It is not a client document.
What the document says, not what the model guessed. Every value opens the page it was read from.
How it works
Each step plays on its own as you scroll.
Upload a PDF, docx or xlsx through the encrypted dropzone. The document type is detected and matched to a template, so there is nothing to set up.
Encrypted dropzone · up to 20 MBEach figure and clause is tied to the page and the exact line it was quoted from. If the text is not in the document, the field stays blank instead of guessed.
Page + quote on every valueReviewer flags point at anything missing, unclear or inconsistent. Click a value to see its source, then export to CSV, JSON or a branded PDF with citation footers.
PDF · CSV · JSONAnswers to the key questions
It extracts Change Order Number, Cost Adjustment, Schedule Extension Days and Approval Signatures from your change order, each with its page and the quoted passage.
Yes. The Free plan is $0, needs no card, and covers 5 documents (up to 200 pages in total) with every template, source citations and zero-retention processing. You can also run the sample document on this site without signing up, or email us up to 5 of your own documents and get them back cited within 48 hours, free.
Every extracted value carries the page and the passage it was read from. Click a value and the document preview jumps to that line, highlighted, so a check takes seconds rather than a search through the file.
The field stays blank and is flagged. ValidExtract never fills a gap with a guess. Reviewer flags also point out anything unclear or inconsistent, such as a figure that is defined differently in two places, so you know exactly what to look at before you rely on the output.
They are processed in memory and deleted the moment extraction finishes, on every plan including Free. Nothing is stored afterwards and your documents are never used to train a model.
No. Upload the file, the document type is matched to a ready-made template, and the fields come back with their citations. There is nothing to install and nothing to configure; three steps from upload to a checked export.
A document is one file of up to 200 pages; a longer file counts as one document per 200 pages. Free: 5 documents, up to 200 pages in total. Pro: $299 a month for 50 documents. Team: $499 a month for 125 documents and 3 seats. Corporate: $3 per document with a one-time $4,997 setup fee and no monthly minimum. Prices are in US dollars.
Yes. Export to CSV, JSON, or a branded PDF whose citation footers link back to the source pages, ready to hand to a partner, a lender or an auditor.
Every value is tied to the exact page and passage it came from, and a field is left blank rather than guessed when the text is not there. It is built for people reading long filings, agreements and leases, needs no prompts or training, and does not keep your files. See how it compares with other tools.
ValidExtract is built on ISO 27001 and SOC 2 Type II audited infrastructure and is GDPR-ready, with encryption in transit over HTTPS.
Hi. Ask about pricing, citations, data handling or which documents we read.