\n\n
ValidExtract
Open workspace Sign in

Templates / Construction Subcontractors

Construction Subcontract

Construction Subcontract Data Extractor

Extract contract sum, retainage percentage, payment terms and scope of work from construction subcontracts, each cited to the article and page it came from.

Built for: Subcontractor Project Manager. Free for your first 5 documents.

What this template extracts

4 fields, each cited. Citations look like: Page 2, Article 4.1.

Contract Sumpage + quote
Retainage Percentagepage + quote
Payment Termspage + quote
Scope of Workpage + quote

A real extraction

See it on a real public document. The construction subcontractors template, shown on a filing anyone can check.

app.validextract.com/workspace

Choose a template

Upload your document
Subcontract · Subcontract, Northwest Arkansas Project11 fields · 3 flagsCited 11 of 11

A subcontract for the Northwest Arkansas Project. It’s a public document, filed on SEC EDGAR. It is not a client document.

Progress paymentsPaid as the work progresses, on estimates approved by both owner and contractor
Payment timing30 days from the first Monday after the owner approves the invoice (or 30 calendar days from invoice if the sub provides a bond)
“within thirty (30) days from the first Monday following the date of approval of the correct invoice by the Owner”Source: p. 8, Sec. 8.2 and Sec. 8.4
Retainage5%, which the contractor can raise to a maximum of 10% if there’s no bond, the work isn’t acceptable or the sub is behind schedule
Retainage release90 days after the last paid invoice with no open money issues or backcharges; paid quarterly
DelayNo damages for contractor-caused delay: time extension only, and only with a written claim "within a reasonable time"
IndemnitySub defends and indemnifies owner and contractor for claims arising from its acts or omissions
InsuranceAuto liability at least $500,000 combined; excess / umbrella at least $1,000,000
Termination for defaultOn 24 hours’ written notice by registered mail; contractor can set off its completion costs
DisputesMeet within 10 business days, then AAA mediation, then arbitration by a single arbitrator
WarrantyOne year after the sub’s work is completed, or longer if the contract documents say so
Signing deadlineVoid if not signed and returned within 4 business days

What the document says, not what the model guessed. Every value opens the page it was read from.

Reviewer flags

  • Two payment clauses give different timing: Sec. 8.2 (30 calendar days from invoice, if bonded) and Sec. 8.4 (30 days from the first Monday after owner approval).
  • The delay-claim notice period is only "a reasonable time", with no day count, and delay is compensated with time only (no money).
  • There is no liquidated damages clause, and no subcontract sum: pricing is by unit-rate schedules.

How it works

Each step plays on its own as you scroll.

new-extractionHTTPS
PDF
annual-report-2025.pdf
112 pp
Template10-K financials
Fields to extract18
Prompts to writeNone
Model to trainNone
Template matchedReady
01 · Upload

Drop a filing, it finds the template

Upload a PDF, docx or xlsx through the encrypted dropzone. The document type is detected and matched to a template, so there is nothing to set up.

Encrypted dropzone · up to 20 MB
extract · 10-K1440 · reading
Total revenue $48.2Mp. 7
Gross margin 52.4%p. 7
Net income $6.1Mp. 9
Long-term debt $22.5Mp. 31
Renewal optionBlank
18 fields18 cited
02 · Extract

Every value lands with its page

Each figure and clause is tied to the page and the exact line it was quoted from. If the text is not in the document, the field stays blank instead of guessed.

Page + quote on every value
review · exportRound 1
Revenue growth rounds 11.1% to 11%Flag✓ Checked
Share count is in a later noteFlag✓ Checked
Values cited18 of 18
Branded PDFCSVJSON
2 flagsAll checked
03 · Verify

Check the flags, then export

Reviewer flags point at anything missing, unclear or inconsistent. Click a value to see its source, then export to CSV, JSON or a branded PDF with citation footers.

PDF · CSV · JSON

FAQ

Answers to the key questions

01What does the Construction Subcontract Data Extractor pull out?

It extracts Contract Sum, Retainage Percentage, Payment Terms and Scope of Work from your construction subcontract, each with its page and the quoted passage.

02Is there a free plan?

Yes. The Free plan is $0, needs no card, and covers 5 documents (up to 200 pages in total) with every template, source citations and zero-retention processing. You can also run the sample document on this site without signing up, or email us up to 5 of your own documents and get them back cited within 48 hours, free.

03How do source citations work?

Every extracted value carries the page and the passage it was read from. Click a value and the document preview jumps to that line, highlighted, so a check takes seconds rather than a search through the file.

04What happens when a value is not in the document?

The field stays blank and is flagged. ValidExtract never fills a gap with a guess. Reviewer flags also point out anything unclear or inconsistent, such as a figure that is defined differently in two places, so you know exactly what to look at before you rely on the output.

05What happens to my files?

They are processed in memory and deleted the moment extraction finishes, on every plan including Free. Nothing is stored afterwards and your documents are never used to train a model.

06Do I need to write prompts or train a model?

No. Upload the file, the document type is matched to a ready-made template, and the fields come back with their citations. There is nothing to install and nothing to configure; three steps from upload to a checked export.

07How is a document counted, and what do the plans cost?

A document is one file of up to 200 pages; a longer file counts as one document per 200 pages. Free: 5 documents, up to 200 pages in total. Pro: $299 a month for 50 documents. Team: $499 a month for 125 documents and 3 seats. Corporate: $3 per document with a one-time $4,997 setup fee and no monthly minimum. Prices are in US dollars.

08Can I export the results?

Yes. Export to CSV, JSON, or a branded PDF whose citation footers link back to the source pages, ready to hand to a partner, a lender or an auditor.

09How is ValidExtract different from other extraction tools?

Every value is tied to the exact page and passage it came from, and a field is left blank rather than guessed when the text is not there. It is built for people reading long filings, agreements and leases, needs no prompts or training, and does not keep your files. See how it compares with other tools.

10Which security and compliance standards do you meet?

ValidExtract is built on ISO 27001 and SOC 2 Type II audited infrastructure and is GDPR-ready, with encryption in transit over HTTPS.